Évaluation Trustpilot étoiles 4,7/5 Excellent

Magnetic Mini GPS Tracker with Real-Time Location, Motion Alerts and Audio Monitoring

£31.99 Regular price £49.99 36% off today
/
Runs small True to size Runs large

Only few items left
🇬🇧

Loading...

Free Shipping
30 Days Money-Back Guarantee
Ordered the wrong colour or size? We’ll send you a different product free of charge. Simply report it within 30 days of delivery.

Never lose what matters most

A stolen car. Lost luggage. A missing pet. That sinking feeling when you realise something precious has gone.
This tracker gives you back control. With real-time GPS tracking on your smartphone, you always know exactly where your belongings are, instantly.

Why this tracker protects you:

Real-time GPS tracking Real-time location updates straight to your phone. See where your vehicle, luggage or valuables are, any time, anywhere.

Instant motion notifications Get a notification the moment a tracked item starts to move. Ideal for preventing theft or keeping an eye on what matters to you while you're away.

Audio monitoring function Listen in remotely using the built-in audio function. Extra security when you need to know what's going on.

Strong magnetic mount Attaches securely to any metal surface in seconds. No drilling, no installation, no hassle.

Long-lasting battery A reliable 3V lithium coin cell keeps the tracker running when you need it most. Set it and forget it.

Weatherproof Works in extreme temperatures from -20 °C to +70 °C. Rain, snow or heat – it stays on track.

Perfect for protecting:

  • Vehicles Helps prevent car theft with instant alerts.
  • Luggage and bags Never lose your belongings while travelling again.
  • Valuable equipment Protect your expensive tools and gear.
  • Bicycles and motorbikes Find your vehicle again if it ever goes missing.
  • Elderly family members Enjoy peace of mind knowing your loved ones are safe.
  • Pets Always know where your four-legged companion is.

Included:

Every tracker comes with:

  • Magnetic GPS tracker with live location functions
  • Full control via smartphone app (iOS and Android)
  • Real-time motion alerts
  • Audio monitoring function
  • Easy set-up in just a few minutes

Technical details:

  • Material: Sturdy ABS plastic
  • Dimensions: 4.12 cm × 1.36 cm (ultra-compact)
  • Frequency: 850/900/1800/1900 MHz
  • Operating temperature: -20 °C to +70 °C
  • Power supply: 3V lithium coin cell
5 stars
Verified

Actually looks like the photos

Colour and fit matched what I expected from the website. The material feels better than expected and delivery was quick. Really pleased with the order. Living in London, I was really pleased with how quickly it arrived.

Robert H.
Robert H.
5 stars
Verified

Next day, no bother

Ordered in the afternoon and it arrived the following day. Fits brilliantly and the whole process was straightforward. I’m based in London and the whole process was straightforward.

Lucy P.
Lucy P.
4 stars
Verified

Still feels current

The styling feels clean and modern rather than dated. Classic pieces without trying too hard to follow trends. As someone living in London, I really like how easy these pieces are to wear.

D
Daniel W.
5 stars
Verified

Sizing is spot on

Followed the size guide and my usual size fit perfectly. Nicely balanced fit without feeling too loose or too slim. I’m in London and the sizing was spot on for my usual size.

Katherine B.
Katherine B.
5 stars
Verified

Proper quality

The fabric has a substantial feel and the finishing is very neat. It looks and feels like a genuinely well-made piece. Living in London, I was impressed with the quality and finishing.

William T.
William T.
4 stars
Verified

Looks exactly like the photos

The colour and cut were accurate to the website and it arrived nicely packaged. Very happy with it. I’m based in London and it arrived nicely packaged and exactly as expected.

A
Alice R.
5 stars
Verified

Sorted without any fuss

I ordered the wrong size and contacted support. They replied quickly and sorted everything without unnecessary back and forth. I live in London and support sorted everything quickly without unnecessary back and forth.

M
Mark S.
5 stars
Verified

A real person behind it

The attention to detail comes through in the packaging, service and consistency. Ordering feels much more personal. Being based in London, I appreciated the attention to detail and personal service.

Patricia G.
Patricia G.
4 stars
Verified

Held up after washing

Several washes later and it has kept its shape and colour. Still looks much like it did when it arrived. I’m in London and after several washes it has kept its shape and colour.

S
Sam F.
5 stars
Verified

Worth every penny

Compared a few alternatives before ordering. The quality feels very fair for the price and the product feels built to last. Living in London, I compared a few alternatives before ordering and this felt worth it.

N
Natalie C.
5 stars
Verified

My husband ordered one too

I ordered first and after seeing mine my husband went straight to the site for his own order. Great choice for both of us. I’m based in London and after seeing mine, my husband wanted one too.

Jenny A.
Jenny A.
4 stars
Verified

Returns were simple

One item wasn't quite right so I contacted the team. They responded quickly and handled the return without hassle. I live in London and the return was handled quickly and without hassle.

T
Thomas L.
5 stars
Verified

No issues at all

Delivery was quick and straightforward. The quality is excellent and the sizing was accurate. Living in London, I was happy with the quick delivery, quality and accurate sizing.

A
Andrew M.
4 stars
Verified

Third order this month

Third order already. That probably says enough. I’m based in London and this was already my third order this month.

C
Claire D.
Summer Sale

Londonword

At Londonword, we have been bringing together the latest clothing, gadgets, and accessories in our (online) store since 1999. We curate products that fit a modern lifestyle—stylish, practical, and always evolving. Whether you are looking for a new outfit or unique items to make your daily life a bit easier or more enjoyable, you will find it all with us.

Customer Service

We Are Here For You

Do you have questions about an order, delivery, or product? Feel free to contact us. You can always call or email us.

Available:
Monday to Saturday
9 AM – 8 PM
Free delivery
FREE DELIVERY

Fast and free shipping on all your orders.

30-day returns
30-DAY RETURNS

Not satisfied? Return your order within 30 days hassle-free.

Secure payments
SECURE PAYMENTS

Shop with confidence knowing your payment information is safe.

Customer support
CUSTOMER SUPPORT

Have a question? Reach out to our customer support team.


Recently viewed